Basement floorplan, version 3
Posted by Geoff | Filed under Renovations
[photopress:Basement_Floor_Plan3.gif,thumb,pp_image]
Here’s what’s different:
- Office and mechanical rooms swapped (this was done because the boiler can’t vent up a chimney — too low-temperature, so the condensation from the exhaust would completely rust the thing out; on the bright side, we get to use the void upstairs because of the change)
- The previously compact tub is now a walk-in shower (custom-built, of course) and a bit of rearrangement in the bathroom, with doors relocated
- Windows added to the right-side wall (though because I can’t find an installer, they’ll have to wait until a subsequent renovation phase; there’ll eventually be a third window where the stairs currently are)
This is what we’re now going on, and the plates to handle the outer and load-bearing walls are now in place.










June 26th, 2007 at 15:03
Geoff – it all looks great! You have obviously put a lot of thought into the plan and I think you have the best there is. You still have space left to work with whether its storage or a playroom.
I have to say you are doing a wonderful job and I am very proud of you! Linda